Look for orange ? buttons throughout the report — hover or tap to learn what each section means and why it matters.
How to use this report

This is an AI-assisted review of the records supplied. It reads the documents, sets out what they show and what they do not, and lists the questions worth asking next. Every finding is an indicator to verify against your own records — not a determination about the scheme.

It is not legal advice, not a compliance certificate, and not a substitute for advice from a qualified NSW strata lawyer, conveyancer, building consultant or licensed strata manager. No lawyer or licensed strata manager has reviewed this report.

FoxAudit Report

Oceanview Towers

SP 87412  ·  24 Shoreline Drive, Sydney NSW

67 out of 100
Attention Needed
24 lots
7 of 8 categories assessed
5 documents analysed

Key Insight The Key Insight is FoxAudit's single most important observation about your scheme — the thing that most clearly explains the score and tells you where to focus first.

Your fund holds $127,450 against $380,000 in foreseeable 10-year costs. The plan behind those figures was prepared in 2019 and has not been reviewed since, so the levy it informs is set against 2019 prices.

Top 3 Actions The three highest-priority actions from across all findings — sorted by urgency. Each maps to a specific finding in the Category Detail section.

1
Urgent Commission a review of the Capital Works Fund Plan by an independent quantity surveyor, covering the full ten-year horizon and every major building element. Within 60 days  ·  s.82 SSMA 2015
2
General meeting Table the standard-form Capital Works Fund Plan requirement at the next general meeting, with a proposed timetable for adopting it.
3
Committee Ask the strata manager to add sustainability infrastructure — solar, EV charging and water efficiency — to the agenda for the next capital works review.

Executive Summary

A plain-English reading of what the records show: where the scheme stands, what is pulling the score down, the financial position, what to look at first, and what could not be confirmed. It is assembled from the findings and checklist, not written separately.

Where this scheme stands

Oceanview Towers scores 67 out of 100 — Attention Needed. Some gaps identified — attention recommended. The score is based on 7 of 8 categories and 5 documents. It reflects what those records show, not a verified position for the scheme.

What is driving the score

The records point most clearly to these areas. 2025–26 NSW Strata Reforms (5/100) — The documents pre-date the April 2026 commencement and do not yet evidence any transition planning toward the standard-form Capital Works Fund Plan. Sustainability (15/100) — Sustainability infrastructure was raised by a lot owner in general business but has not been formally assessed or costed in the capital works plan. Meeting Procedures and Insurance are well evidenced at 80 or above.

Financial position

Your fund holds $127,450 against $380,000 in foreseeable 10-year costs. The plan behind those figures was prepared in 2019 and has not been reviewed since, so the levy it informs is set against 2019 prices.

What to do first

The documents support 1 HIGH-severity and 4 MEDIUM-severity findings. The three priority items on the cover are where to start; the full action plan follows. Each is a practical step to verify or raise — a committee or general meeting agenda item, not a legal direction.

What could not be confirmed

16 checklist items could not be confirmed from the documents provided — each is listed under “Not confirmed in the documents” with the record that would confirm it. Developer Obligations was not assessed because the relevant documents were not provided. These are not findings against the scheme; they are the gaps in what could be verified from the records supplied.


Action Plan

Every finding is sorted into one of four groups so you know who can act. Urgent = start now. General Meeting = needs an owners corporation vote. Committee = the strata committee can resolve it. Annual = address at each AGM.

Each item is a practical step to verify or to raise with your committee or strata manager. Timeframes are FoxAudit’s suggested priority based on the records provided — they are not legal deadlines, and they do not replace advice on what your scheme is required to do.

Urgent

  • Commission a review of the Capital Works Fund Plan by an independent quantity surveyor (within 60 days)

General Meeting

  • Table the standard-form Capital Works Fund Plan requirement, with a timetable for adopting it
  • Present revised capital works levy recommendations, informed by the updated plan

Committee

  • Add sustainability infrastructure to the agenda for the next capital works review
  • Retrieve the 2023 AGM minutes and proxy instruments and file them with the scheme records

Annual / AGM

  • Review and confirm all insurance covers, and obtain an updated building replacement valuation at least every five years

Questions to ask your strata manager

Each question is generated from a specific checklist item the documents did not confirm. They are written to be copied straight into an email — the answers are what move an item from "not confirmed" to "confirmed".

Each question is tied to something the documents provided did not confirm. They ask for records or clarification — they do not assume anything has gone wrong.

  1. 12025–26 NSW Strata ReformsHas the Capital Works Fund Plan been assessed against the NSW Fair Trading standard form, and when will it be updated?
  2. 2SustainabilityWhich sustainability items have been assessed — solar, EV charging, water efficiency?
  3. 3Building FundWhen were levies last revised against the Capital Works Fund Plan, and what did that review conclude?
  4. 4Maintenance PlanWhen was the Capital Works Fund Plan last reviewed, and is a review scheduled?
  5. 5Building UpkeepDoes the scheme keep a maintenance register, and can I have a copy?
  6. 6Meeting ProceduresCan you send the notice of the last AGM, showing the date it was issued?
  7. 7InsuranceWhen was the last independent insurance valuation, and can I see it?
  8. 82025–26 NSW Strata ReformsWhat steps have been taken to transition to the April 2026 Capital Works Fund Plan requirements?

Not confirmed in the documents

A checklist item the uploaded documents did not evidence. It is not a finding against the scheme — the record may well exist and simply not have been uploaded. The third column names the document that would settle it.

These are not findings against the scheme. They are things the documents provided did not show — each may well exist and simply not have been included in what was uploaded. Twelve of the sixteen unconfirmed items are shown here.

What was not confirmedWhy it mattersWhat would confirm it
Plan assessed against the standard form2025–26 NSW Strata Reforms From 1 April 2026 the Capital Works Fund Plan is expected to follow the NSW Fair Trading standard form. A plan in the standard form, or a record that the plan has been assessed against it.
Transition steps recorded2025–26 NSW Strata Reforms Documented transition steps show the scheme is moving toward the April 2026 requirements rather than waiting. Minutes or a strata manager's report recording transition steps.
Sustainability included in the plan2025–26 NSW Strata Reforms The reforms expect sustainability infrastructure to be considered within capital works planning. A Capital Works Fund Plan that includes sustainability infrastructure.
Specific items consideredSustainability Considering specific items (solar, EV charging, water, materials) is what turns a general intention into a plan. Minutes, a feasibility note or a plan entry naming the items considered.
Feasibility study referencedSustainability A feasibility study is the clearest evidence that options have been properly assessed. A sustainability assessment or feasibility study.
Levy appears informed by the capital works planBuilding Fund If levies have not moved since the plan was prepared, the fund is unlikely to keep pace with the works it is meant to pay for. Budget papers or minutes showing the levy was set with reference to the plan.
Independent adequacy assessment recordedBuilding Fund An independent adequacy assessment is the clearest evidence that the levy is enough for the works ahead. A quantity surveyor's adequacy assessment or an equivalent independent report.
Reviewed within five yearsMaintenance Plan A plan older than five years is due for review, and its cost estimates may no longer reflect today's construction prices. A Capital Works Fund Plan dated within the last five years, or minutes recording a review.
Condition assessment includedMaintenance Plan Condition ratings or remaining-life estimates show the timing in the plan is based on inspection rather than assumption. A plan or condition report with condition ratings or remaining useful life for major elements.
Maintenance register existsBuilding Upkeep A maintenance register is the usual way a scheme shows how common property has been looked after over time. The scheme's maintenance register or log.
Notice period documentedMeeting Procedures Notice given short of the required period can put resolutions at risk. The AGM notice showing the date it was issued.
Independent revaluation recordedInsurance An independent replacement-cost valuation within the last five years is how schemes keep the sum insured realistic. An insurance replacement-cost valuation report dated within the last five years.

Score Breakdown

Each bar shows how that category performed. The Fox Score is a weighted average of the assessed categories — categories with insufficient documentation are marked Not Assessed and excluded from the total.
01  Maintenance Plan
75
Attention Needed
02  Building Fund
50
Significant Gaps
03  Building Upkeep
75
Attention Needed
04  Meeting Procedures
82
No Issues Found
05  Insurance
85
No Issues Found
06  2025–26 NSW Strata Reforms
5
Critical Gaps
07  Sustainability
15
Critical Gaps
08  Developer Obligations
Not assessed

Fox Score The Fox Score is a weighted average across the assessed categories — each category contributes a fixed proportion, so the Maintenance Plan moves the score more than Sustainability does. Category 8 was excluded: this scheme was registered before the 1 July 2016 developer-obligation threshold.
67 / 100

Category Detail

Each finding includes the compliance check, a severity rating (HIGH / MEDIUM / LOW), and a direct quote from your documents as evidence — so every conclusion is fully traceable.
01 Maintenance Plan
75 Attention Needed
Capital Works Plan in place — 10-year horizon confirmed
LOW
"Capital Works Fund Plan — Oceanview Towers SP 87412. Forecast period: 2019–2029. Prepared by Lannister Building Consultants, September 2019."
CWP dated 2019 — approaching 5-year review threshold
MEDIUM
"Prepared September 2019." A Capital Works Fund Plan is expected to be reviewed at least every five years (s.82 SSMA 2015), so a 2019 plan is due for review. Its cost estimates also pre-date recent construction inflation.
Action: Commission a review of the plan by an independent quantity surveyor before the next Annual General Meeting.
CWP not in NSW Fair Trading standard form (April 2026 requirement)
HIGH
The 2019 CWP is in a consultant's proprietary format. The Strata Schemes Legislation Amendment Act 2025 (NSW) requires schemes to adopt the standard form prescribed by NSW Fair Trading from 1 April 2026.
02 Building Fund
50 Significant Gaps
Capital works fund balance adequate against CWP forecast
LOW
"Capital Works Fund balance as at 30 June 2023: $127,450. Current quarterly levy: $2,200 per lot." CWP projects $380k in works over 10 years — fund trajectory appears sufficient at current contribution rate.
Capital works levy set and evidenced in levy schedule
LOW
"Levy Schedule FY2024: Capital Works Fund contribution $2,200 per quarter per unit entitlement."
No evidence levies have been reviewed against updated cost estimates since 2021
MEDIUM
AGM minutes 2022, 2023 not in bundle. No record of levy review against revised cost estimates noted in 2024 AGM minutes. Construction costs have increased materially since the 2019 CWP was prepared.
03 Building Upkeep
75 Attention Needed
Annual fire safety statement current — March 2024
LOW
"Annual Fire Safety Statement issued 12 March 2024 by Flame Safe Inspections. All essential fire safety measures satisfactory."
No known defects or overdue maintenance noted in AGM minutes
LOW
"Building Manager's Report — no outstanding maintenance items. External repaint scheduled Q3 2025 per CWP."
External repainting scheduled per CWP and confirmed in AGM
LOW
"Resolved: to proceed with external repainting in Q3 2025 as per the Capital Works Fund Plan estimate of $62,000."
04 Meeting Procedures
82 No Issues Found
AGM held 14 March 2024 — within required timeframe
LOW
"Annual General Meeting of the Owners Corporation — Oceanview Towers SP 87412 — held Thursday 14 March 2024 at 6:30pm."
Quorum recorded — 8 of 24 lots present or represented
LOW
"Present: 6 lot owners in person, 2 by proxy. Quorum confirmed by Chairperson."
2023 AGM minutes not included in document bundle
MEDIUM
Minutes reference "the 2023 AGM budget resolution" but no 2023 AGM minutes were provided. Prior-year minutes are normally tabled and confirmed at each AGM.
Action: Ask the strata manager for the 2023 AGM minutes and file them with the scheme records.
Proxy instruments not appended to AGM minutes
MEDIUM
"2 lots represented by proxy." Proxy forms were not included in the document bundle. Proxy records are what show the votes cast by proxy were properly authorised — see the relevant NSW strata meeting procedure requirements (SSMA 2015 Schedule 1).
Action: Ask the strata manager for the proxy instruments and the dated meeting notice, and file them with the scheme records.
05 Insurance
85 No Issues Found
Building insurance confirmed — $8.2M replacement value
LOW
"Certificate of Currency — IAG Insurance. Policy No. BLG-4471-2024. Building (Strata) — Insured sum: $8,200,000. Valid to: 30 June 2024."
Public liability cover — $20M confirmed
LOW
"Public Liability — $20,000,000. Voluntary Workers — included. Workers Compensation — included (strata managing agent)."
Certificate of currency current at time of analysis
LOW
Policy valid to 30 June 2024. Report generated March 2024. Cover is current.
06 2025–26 NSW Strata Reforms
5 Critical Gaps
Reform transition note: These reforms commenced 1 April 2026. The documents reviewed pre-date that commencement, so the next AGM or capital works review is the first practical opportunity to address them. This is context, not a finding against the scheme.
CWP not in standard form prescribed by NSW Fair Trading
HIGH
The existing CWP (Lannister Building Consultants, 2019) is in a consultant's proprietary format. The April 2026 reforms require adoption of the standard form CWP prescribed by NSW Fair Trading by the next AGM after 1 April 2026.
07 Sustainability
15 Critical Gaps
No sustainability infrastructure planning in CWP or AGM minutes
HIGH
Neither the 2019 CWP nor the 2024 AGM minutes contain any reference to solar panels, EV charging infrastructure, or water efficiency measures. Since 1 July 2025, sustainability infrastructure costs are to be considered when preparing capital works fund estimates.
EV charging infrastructure not addressed
HIGH
Electric vehicle charging was raised by a lot owner under general business at the 2024 AGM. No assessment, costing or agenda item followed. Since 1 July 2025, sustainability infrastructure costs are to be considered when preparing capital works fund estimates.
Action: Add sustainability infrastructure to the agenda for the next capital works review.
Solar energy generation not assessed in CWP
HIGH
CWP does not address solar panel installation or energy generation. This is a new requirement under the 2025 reforms for all schemes updating or adopting a CWP from 1 April 2026.
08 Developer Obligations
Not Assessed
Developer obligations under the 2025 reforms apply to schemes registered on or after 1 July 2016. Oceanview Towers (SP 87412) was registered in February 2007 and is therefore not subject to these requirements. This category was excluded from the Fox Score calculation.

Documents Analysed

FoxAudit lists every document it analysed so you can verify the basis for each finding. Quality is rated Full (complete text extracted) or Partial (some pages unclear). Only assessed documents contribute to findings.
Document Type Quality
AGM Minutes Annual General Meeting minutes, 14 March 2024. good
Capital Works Fund Plan Capital Works Fund Plan 2019–2029, prepared September 2019. good
Financial Statements Financial statements for the year ended 30 June 2023. good
Insurance Certificate of Currency Certificate of currency, policy year to 30 June 2024. good
AGM Notice / Agenda Notice of Annual General Meeting 2024. Agenda included; issue date not shown on the copy provided. partial

Recommended additional documents: a Capital Works Fund Plan dated within the last five years, a condition report, the 2023 AGM minutes and proxy instruments, and a current insurance replacement-cost valuation. Providing these would confirm the items marked not confirmed and expand the assessment.


General Information Only — Not Legal Advice

FoxAudit is an AI-assisted review of the records provided. Findings are indicators to verify, not determinations. This report does not constitute legal advice, is not a compliance certificate, and is not a professional strata inspection or a Section 184 certificate. No lawyer or licensed strata manager reviews a FoxAudit report before it reaches you. Findings are based solely on the documents provided and may not reflect the complete compliance position of the scheme. FoxAudit cannot verify the authenticity, completeness, or currency of uploaded documents.

Legislative references reflect the Strata Schemes Management Act 2015 (NSW) as amended to 1 April 2026. Users should verify current requirements with a qualified NSW strata lawyer. StrataFox Pty Ltd accepts no liability for reliance on this report. © 2026 StrataFox.